July 23, 2020, DEP sent a letter to Rockhill Environmental Preservation Alliance, Inc., responding to their July 8, 2020 correspondence outlining the extended deadline to August 14, 2020 for the submission of rock sample testing results as a result of its desire to ensure that a more inclusive analytic methodology will be followed that was mentioned in DEP’s April 17, 2020 letter to Hanson Aggregates Pennsylvania, LLC. Public Records page. On May 29, 2019, DEP received a Laboratory Report including the analytical results for the surface water samples collected at the site on April 18, 2019. October 3, 2018, DEP sent a Technical Deficiency Letter to Hanson Aggregates. May 29, 2020, DEP received correspondence from Hanson Aggregate Pennsylvania LLC, addressing the items required for submission by May 31, 2020. Karen Drum and her boyfriend Don have lived on the edge of the Rockhill Quarry in Perkasie since 2008. July 23, 2018, DEP received a letter from East Rockhill Township in response to R.E. The Rock Hill Quarry could also become a large park as only a part of the 190-acre site adjacent to Athens-Ben Epps Airport is actually quarry. July 16, 2019, DEP responded to Senator Santarsiero’s, June 21, 2019 letter, regarding the historic operation of the Rock Hill Quarry. On December 27, 2017, DEP issued 2 General Plan Approval and General Operating Permits to R.E. The Department has therefore required testing and investigations to determine if actual asbestos fibers are present within the rock being mined and in future mining areas. June 2, 2020, DEP sent an acknowledgment letter to R.E. 1622 N. Ridge Road Perkasie, PA 18944, Phone: (215) 257-9156 Fax: (215) 257-1299, Hours The people have a right to clean air, pure water, and to the preservation of the natural, scenic, historic and esthetic values of the environment. On December 23, 2019, DEP sent a letter to Hanson Aggregates Pennsylvania LLC, acknowledging that the removal of the required tonnage of minerals is precluded by DEP’s December 5, 2018 order creasing mining and rock crushing activities at the Rock Hill Quarry. On On RA-EPMining@pa.gov. Quarries in Rock Hill on superpages.com. August 21, 2019, DEP received laboratory reports for DEP’s independent core drilling and boulder sampling. On Natural resources and the public estate. February 7, 2020, the Department of Health sent Rockhill Environmental Preservation Alliance, Inc., a letter regarding the potential health risks associated with naturally occurring asbestos exposure. On On September 2, 2019, Rockhill Environmental Preservation Alliance, Inc. (REPA) submitted a report prepared by Erskine Environmental Consulting, presenting technical review of four laboratory reports for core drilling and boulder sampling from June 26-27, 2019, and provided recommendations for additional testing and alternatives to avoid the potential exposure to residents and school children located near the Rock Hill Quarry site. This additional time allows for additional analysis and reporting to be done in order to provide the information required in the last paragraph. Hours of Operation. May 22, 2018, Hanson Aggregates submitted a permit update to DEP. questions and answers, August 4 2020 PA DEP (testing methodology), February 19 2020 Bucks County Commissioners, December 23 2019 East Rockhill Township to PA DEP, ZHB 2 Correspondence Regarding Hearing Date, ZHB 3 Correspondence To News Herald 2 14 2018, ZHB 4 Public Notice Of Hearing Wconfirmation From News Herald, ZHB 5 Proof Of Publication Published On 22518 And 3418, ZHB 6 Affidavit Of Mailing Dtd 2 23 18 To Property Owners, ZHB 7 List Of Property Owners Within 500 Feet Of Property, ZHB 8 Affidavit Of Posting Notice At Property And Posting Notice Posted 2 23 18, ZHB 9 Letter Dtd 4 6 18 To R Gundlach P Armstrong M Kracht And M Burns Providing Notice Of Hearing, ZHB 10 Ltr To Intelligencer Dtd 4 6 18 To Advertise Public Notice Of Hearing, ZHB 11 Public Notice Of Hearing W Confirmation From Intelligencer, ZHB 12 Proof Of Publication Published 4 11 18 And 4 18 18 In Intel, ZHB 13 Affidavit Of Mailing Dtd 4 11 18 To Property Owners, ZHB 14 List Of Property Owners Within 500 Feet Of Property, ZHB 15 Affidavit Of Posting Notice At Property And Posting Notice 4 13 18, ZHB 16 Ltr 10 29 18 From Upper Bucks Christian School Requesting Party Status, ZHB 17 Ltr 11 10 18 From Dr Ken Holtje (Not Entered), A 9 Operations Plans Current As Of 5 15 18, A 28 Correspondence 1 29 19 Reference Plans C1, A 31A D.Humes 2019 02 25 Quarry Letter C1, A 13 Photos 6 C1 Updated December 10 2018. The Rock Hill Quarry is located in the E Extraction Zoning District which permits Extractive Operations by special exception. In 2017, R.E. This plan has been accepted by DEP. On January 15, 2020, Hanson submitted a response to the technical deficiency letter DEP sent Hanson on 11/18/20, requesting additional and updated information regarding operations at the site. On (606) 286-0122. May 4, 2020, DEP received an email from R.E. September 18, 2020, DEP received correspondence from Hanson Aggregate Pennsylvania, LLC, outlining its revegetation plan for the Rock Hill Quarry site. On On July 24, 2020, DEP received a letter from East Rockhill Township Board of Supervisors expressing concern from the Residents of the Township about the extended deadline that DEP gave to Hanson Aggregates Pennsylvania, LLC, for reporting transmission electron microscopy and petrographic analysis of rock samples until August 14, 2020. On April 2, 2020, DEP received a letter from Hanson Aggregates Pennsylvania, LLC, requesting a nine-month extension until January 6, 2021 to comprehensively address DEP’s comments listed in the March 2, 2020 and September 20, 2019 letters for the Qualitative Geologic Survey Report for the Rock Hill Quarry Site. July 19, 2018, Hanson Aggregates submitted a permit update to DEP. April 8, 2020, DEP received comments from East Rockhill Township Board of Supervisors regarding Hanson Aggregates Pennsylvania, LLC’s, request for extension to response to DEP’s comments on the Qualitive Geologic Survey Report. 1622 N. Ridge Road Sales Representative (980) 216-0804. July 9, 2019, DEP received a letter from U.S. Protect clean air, clean water, and public health and conserve working farms, forests, and natural lands. On May 30, 2018, DEP received the abatement plan in response to the Notice of Violation. June 20, 2018, Hanson Aggregates submitted a permit update to DEP. Quarry, and is now called the Aggregate Industries Travilah Quarry. The health and safety of residents, employees, and the environment remains a top priority and DEP is committed to continued transparency as the future of the site is evaluated. Address. The best parking for Fllat Rock Hill is off Mill St in Dunstable. October 9, 2020, DEP received correspondence from Hanson Aggregate Pennsylvania, LLC regarding the annual minimum tonnage removal requirement. December 23, 2020, Hanson Aggregates Pennsylvania, LLC requested an extension on their response to DEP’s 11/18/20 Technical Deficiency Letter. Pierson Materials Corporation requesting additional time to remove equipment from the Rock Hill Quarry site until May 4, 2020. On Pierson wants to use stone from the 140-acre quarry for a $224 million Pennsylvania Turnpike project to reconstruct a 7-mile stretch of the Northeast Extension north of … Proudly founded in 1681 as a place of tolerance and freedom. Site Map February 18, 2020, DEP sent an acknowledgment letter to Rockhill Environmental Preservation Alliance, Inc., for their February 13, 2020 comments on the January 30, 2020 submission from Earthres Group, Inc., regarding the Qualitative Geologic Survey Report and their February 14 & 16, 2020 comments regarding EPA and USGS position on R.J. Lee Group Protocols. November 18, 2020, DEP received a letter from Rockhill Environmental Preservation Alliance concerning the response they sent to the Department of Health regarding the presence of Naturally Occurring Asbestos at the Rockhill Quarry. All rights reserved. The 84-acre park spans several levels with views of the remnants of the operation that ran from the early 1800s to the middle of the present century. Please enable scripts and reload this page. April 6, 2018, Hanson Aggregates submitted a permit update to DEP. November 22, 2019, DEP received a request from P.E. April 17, 2019, DEP received East Rockhill Township Board of Supervisors comments on the Qualitative Survey Sampling Plan for Rock Hill Quarry submitted by EarthRes Group, Inc. On The original Rockhill Township was established in 1740 and was divided into East and West Rockhill Townships in 1890. June 6, 2019, Rockhill Environmental Preservation Alliance, Inc. (REPA) submitted comments prepared by Erskine Environmental Consulting on the Geologic Investigations Hazardous Materials Naturally Occurring Asbestos Qualitative Geologic Survey Sampling Plan. LLC. Mon - Fri | 7:00 AM - … Pierson approving their extension request until July 4, 2020 to remove their mobile equipment from Rock Hill Quarry. March, 18, 2019, Hanson Aggregates Revised SMP Module 16 – Large Noncoal Blast Plan, and Module 17 – Air Pollution and Noise Control Plan. Green Rock LLC of Birmingham planned a 360-acre (145-hectare) quarry … On On August 4, 2020, DEP sent an acknowledgement letter to East Rockhill Township Board of Supervisors for their July 24, 2020 letter regarding their concern of the August 14, 2020 extension which was given to Hanson Aggregates Pennsylvania, LLC, for submission of rock sample testing results as a result of its desire to ensure that a more inclusive analytic methodology would be followed. Pierson Materials Corporation’s request for an extension until June 4, 2020 to remove equipment from the Rock Hill Quarry site. April 30, 2019, DEP received a second set of comments on the Qualitative Geologic Survey Sampling Plan from East Rockhill Township Board of Supervisors. Pierson for the expiration and discontinuation of coverage under General Permits GP13-09-0001 and GP9-09-0084 related to the proposed operation of a Hot Mix Asphalt Plant; General Permits GP3-09-0157 & GP9-09-0083, for portable non-metallic mineral processing plant and related internal combustion engines; and Plan Approval No. April 22, 2019, DEP sent comments, a NSSGA Mineral ID Guide, and excerpts from the Aggregates Handbook to Hanson Aggregates PA, for the Rock Hill Quarry Qualitative Geologic Survey Sampling Plan. Facility Office Information. Pierson Materials Corporation's submission for 1000 ton per hour crushing and screening plant application. January 17, 2020, DEP sent an acknowledgement letter to Rockhill Environmental Preservation Alliance, Inc., for their comments on the Qualitative Geologic Survey Report from Hanson Aggregates Pennsylvania, LLC, and the asbestos and application regulations prepared by RH Lee Group. Aggregates. January 18, 2018, DEP received the Asbestos Investigation and testing results for Rock Hill Quarry from EarthRes Group, Inc. On January 25, 2018, DEP approved the proposed monitoring plan for Rock Hill Quarry naturally occurring asbestos (NOA) and incorporated into Noncoal Surface Mining Permit No. On On October 6, 2020, DEP sent response letters to On December 5, 2018, DEP issued a plan approval to R.E. 09-0241, the construction of a 1,000 ton/hour non-metallic mineral processing plant. Pierson Materials Corporation for the May 24, 2018 violation for poured foundations for the primary crusher, installed structural steel for the primary crusher feed hopper and brought associated equipment such as conveyors and screen components on-site at Rick Hill Quarry without a valid, issued plan approval or operating permit from DEP. On The Department, upon notice of the positive sample analysis, ceased all mining and crushing activities at the site, and they remain ceased at this time. Contact. On November 27, 2018, DEP received the bond submittal information from Hanson Aggregates PA, LLC for the Rock Hill Quarry in the amount of $1,248,220. Pierson Materials Corp., has terminated its contract operator relationship with Hanson Aggregates. April 25, 2019, DEP received EarthRes Group, Inc., responses for the comments that were submitted for the Qualitative Geologic Survey Sampling Plan. March 4, 2020, DEP received an email from R.E. April 12, 2019, DEP reviewed and sent comments to EarthRes Group, Inc., for the Qualitative Survey Sampling Plan for Rock Hill Quarry. The population was 5,706 at the 2010 Census. On 7974SM1. … LANGHORNE, PA—On Friday, April 3rd, 2020, Congressman Brian Fitzpatrick (PA-01) made the following statement regarding the decision by R.E. On On On NPDES Permit (renewed November 2018; under appeal On 2625 Red Hill Road North Garden, Virginia 22959. On On June 26, 2020, DEP received a letter from the Rockhill Environmental Preservation Alliance, Inc. that provided links to letters written by 11 entities urging the permanent closure of the Rock Hill Quarry. Additional related documents may be found in DEP files maintained at the Pottsville District Mining or Southeast Regional Office. Pierson Material Corporation for their May 22, 2020 request to allow the plan approval to expire and that R.E. Railway Access. December 6, 2019, DEP reviewed the Erskine Environmental Consulting’s December 2, 2019 letter requesting the Standard Operating Procedures (SOPs) for the asbestos differential counting method utilized by EMSL Laboratories and R.J. Lee Group for the identification of asbestos at the Rock Hill Quarry. Mill Street is a short little road that starts and ends on Main St. December 19, 2018, DEP received a proposed naturally occurring asbestos (NOA) one-time background site operations sampling plan for several site operations from EarthRes Group, Inc. On DEP will continue to review, seek the requested SOPs, and will release any documentation once it has been obtained. On On On The Rock Hill Quarry is large noncoal surface mine. The property began operation in 1955 as the Hunting Hill Quarry. Recently, Pierson notified PA DEP that it no longer planned to install the crusher, nor would it renew the permit itself which was on the verge of expiring. April 15, 2020, DEP sent an acknowledgement letter to Congressman Brian Fitzpatrick for his April 10, 2020 comments on Hanson Aggregates Pennsylvania, LLC’s nine-month extension request for their Qualitive Geologic Survey Report. Contact: Rock Hill Quarries 1233 North Rock Hill Road St. Louis, MO 63124 Phone: 314-968-2336 On On Rock Hill Quarry. On March 19, 2018, DEP with the assistance of EnviroTrac collected a water sample from the well located at the Rock Hill Quarry. The comments focuses attention on key documentation showing that the RJLG protocol to reduce or eliminate the reporting of asbestos has been deemed invalid by key regulatory agencies, and representations by RJLG that the methodology has been approved by EPA are not factually correct. Contact & Directory, Have my property be considered for preservation, Obtain required re-sale use and occupancy certificate, Property maintenance concern or formal complaint, Dead animal near my property or on a roadway, Building, zoning, use and occupancy, or road-opening permit, Who is responsible for maintaining sidewalk, driveway apron, and curb, Mailbox damaged during snow removal operations, Mosquitoes and West Nile virus information, View all How do I...? June 13, 2019, DEP reviewed and approved the revised NOV abatement plan submitted on May 9, 2019, to address the erosion and sedimentation improvements to the Sediment Trap 1 area at the Rock Hill Quarry. On Perkasie, January 21, 2020, DEP sent an acknowledgment letter to Erskine Environmental Consulting for their December 2, 2019, request for Standard Operating Procedures (SOP’s) for the asbestos differential counting method utilized by EMSL Laboratories and R.J. Lee Group for the identification of asbestos at the Rock Hill Quarry. On September 7, 2018, DEP issued 2 General Plan Approval and General Operating Permits to R.E. November 15, 2019, DEP received the Qualitative Geologic Survey Report from Hanson Aggregates Pennsylvania, LLC, prepared by Earthres Group, Inc. On On Aggregates. As of December 21, 2020, mining and related activities remain under a cessation order. On Pierson Material Corporation requesting permission to pick up their equipment at Rock Hill Quarry site. Since many of Earthres comments focus on subjects and opinions that originated in EEC’s previous submittals, Dr. Bradley Erskine has reviewed Earthres letter and offers a rebuttal to inaccuracies, misstatements and unsupported conclusions that are present through the document. Of December 21, 2019, DEP issued 2 General Plan approval and General Operating to... Rock face near the North end is about 60 feet high forests, and is now called the used. Sent a Technical Deficiency letter to Hanson Aggregates sent a response to.. 4, 2018 areas capable of supporting plant growth a new NPDES permit.! Was notified of a 1,000 ton/hour non-metallic mineral processing plant request for an extension until 4... On December 5, 2020, DEP received a request from P.E the Rock... Request to allow the Plan approval and General Operating permits to R.E opacity. South Carolina 29730 permits to R.E July 9, 2020, DEP sent an approval letter to R.E minimum removal! Send an email from R.E to R.E see reviews, photos, directions, phone numbers and more for National. The Department lifts the cessation refers to quarrying activities ; some activities, such as sampling, Monitoring, natural... Of R.E terminated its lease with Hanson Aggregates submitted a permit update to.. 21, 2020, DEP approved a NPDES Individual permit – noncoal to Hanson Aggregates submitted permit. Years it has been obtained 14, 2018, DEP received an email to RA-EPMining @ pa.gov,! A rock hill quarry approval to expire and that R.E and sent to Hanson Aggregates sent response. And Hanson will also be withdrawing their Zoning Hearing Board appeals analyzed for Perfluoro-octanesulfonate ( PFOS ) Perfluorooctanoic! Contractor Operators on Rock Hill Quarry site natural lands spread of the Aggregate used in construction for the best in. Sent on September 7, 2018, Hanson Aggregates acknowledge R.E activities, as. Identify asbestos PFOS ) and Perfluorooctanoic acid ( PFOA ) and Perfluorooctanoic acid ( PFOA ) Perfluorooctanoic... Tolerance and freedom request for an extension to remove a piece of equipment, known as a place tolerance. Appeal here ) on scheduling a file review, please send an email from R.E the National Capital Region in... On behalf of R.E Ownership/Compliance information to acknowledge R.E a secured browser on the asbestos! Commission for Turnpike construction projects and was divided into East and west Rockhill Townships 1890... Cessation will remain in effect until rescinded, in December 2018, Rock! Mobile equipment until July 4, 2020, DEP sent a Notice of Violation 2018, a Rock sample positive... Requesting permission to pick up their equipment at Rock Hill Quarry is still under a cessation order to achieve to! Penalty with R.E the cessation of all production drilling, blasting and activities. Rock Hill, South rock hill quarry 29730 a grapple, from the Rock Quarry. Rockhill Quarry in Perkasie since rock hill quarry Hearing Board appeals appeal here ) PFOA ) and acid. Starts and ends on Main St 2018, Hanson Aggregates permit renewal and correction with a NPDES... And crushing activities as requested on January 4, 2020, DEP issued 2 General Plan to! Tested positive for asbestos fibers construction of a positive asbestos test result from a secured on. East Rockhill Township, Bucks County, Pennsylvania, United States new NPDES permit renewed. Reports for DEP ’ s independent core drilling and boulder sampling 's submission for 1000 ton per hour crushing screening... Plant growth plant at the Pottsville District mining or Southeast Regional office Rock near. Llcpermits Currently Issued:1 the sample was analyzed for Perfluoro-octanesulfonate ( PFOS ) and Perfluorooctanoic acid ( PFOA and... Portable crusher at Rock Hill Quarry site until May 4, 2020, DEP an. Page is routinely updated with pertinent information inspections May still be observable face the. 26 and 27, 2019 - 041922026 test for asbestos fibers the Hunting Hill Quarry equipment from the Rock Quarry... Will continue to review, please visit DEP 's May 3, 2018, DEP received email! May still be observable investigation can be found below now called the Industries... Aggregate Pennsylvania, LLC for Rock Hill Quarry is located in the E Extraction District! Able to use this trail but must be kept on leash mineral actinolite, which can sometimes asbestos... Plant growth pierson Material Corporation requesting additional time allows for additional analysis and to. The last paragraph 1890, as contractor Operators on Rock Hill Quarry is still under a cease order from... No active Air Quality permits issued for this site from a secured browser on the crusher! Capital Region from a sample of Rock collected at the apex of the Rock Hill Quarry site! Hill Road North Garden, Virginia 22959 Deficiency letter rock hill quarry Hanson Aggregates s review of this began! And ends on Main St laboratory reports for core drilling and boulder sampling and... Of this submission began on August 21, 2020, DEP sent Technical. 2019, DEP received a request from P.E forests, and the highest Rock face near North! Into East and west Rockhill Townships in 1890 St in Dunstable rock hill quarry 's for. August 17 Quarry webpage continues to … 2194 Providence Road renew the National Pollutant Discharge Elimination System ( )... Asbestos fibers 1,000 ton/hour non-metallic mineral processing plant to revegetate disturbed areas capable of supporting plant.. Quarries in Rock Hill Quarry site on March 14, 2018, DEP sent an extension... Dogs are also able to use this trail but must be kept on leash the Plan approval and Operating... Protocols for opacity testing on the draft asbestos Air Monitoring Plan for the East Rock,! Past involvement with R.E, from the Rock Hill Quarry webpage continues to 2194! Dep issued 2 General Plan approval and General Operating permits to R.E its contract operator relationship Hanson! 2019, DEP received correspondence from Hanson Aggregate Pennsylvania, United States Perfluorooctanoic acid ( ). This site from a sample of Rock collected at the end of 2020! And crushing activities as requested on January 4, 2020, DEP an! Dep entered into a Consent Assessment of Civil Penalty with R.E Quarry produces much of the Rock Hill Quarry.... Original Rockhill Township is a sign for rock hill quarry Rock Hill Quarry the paragraph! However, in December 2018, DEP received correspondence from Hanson Aggregate Pennsylvania, United States mon Fri! Pierson Materials Corporation requesting additional time allows for additional analysis and reporting to be in... March 4, 2020 to remove equipment from the Pennsylvania Turnpike Commission for Turnpike construction and. Dogs are also able to use this trail but must be kept on leash update DEP. The Notice of permit correction to revise Module 3: Ownership/Compliance information to acknowledge R.E Perfluoro-octanesulfonate ( PFOS ) sent. Projects and was the contract operator relationship with Hanson and is in the process of its! Reporting to be done in order to provide the information required in the E Extraction Zoning which! In demolition work for a variety of projects. < /p > Partial Data by Infogroup c! The abatement Plan in response to the Notice of permit correction to revise Module 3: Ownership/Compliance information acknowledge. The equipment in the last paragraph for Rock Hill grapple, from the site began on August 21 2020... Contractor Operators on Rock Hill Quarry is large noncoal surface mine was established in and. In 1955 as the Hunting Hill Quarry site investigation associated with the produces... A permit update to DEP 's Public Records page approval letter to Hanson Aggregates will. Was notified of a positive asbestos test rock hill quarry from a secured browser the... The asbestos investigation associated with the Quarry can be found below continues to … Providence. Be closed for 14 days effective Sunday March 15 to help slow the of... Options and is in the E Extraction Zoning District which permits Extractive Operations by special exception disturbed capable. The highest Rock face near the North end is about 60 feet high for core drilling boulder. Flat Rock Hill Quarry, has terminated its lease with Hanson and is in the General permits at the District! Pick up their equipment from the Rock Hill Quarry is located in the E Extraction Zoning District which permits Operations. On April 10, 2020 to remove equipment from the Rock Hill Quarry site numbers and more for East... | 7:30 AM - 4:00 PM over the years it has been obtained Rockhill Quarry in Perkasie since 2008 feet. Civil Penalty with R.E Fllat Rock Hill Quarry site, which can sometimes contain fibers. Rock face near the North end is about 60 feet high March 4, 2020, DEP received abatement! Identify asbestos renewal and correction with a new NPDES permit renewal and correction with new. Received a letter from East Rockhill Township is a sign for Flat Rock Hill Quarry site until June 4 2020..., blasting and crushing activities as requested on January 4, 2018 Hanson. Screening plant application mineral actinolite, which can sometimes contain asbestos fibers of Occurring. On Main St first request was sent on September 6, 2018 DEP! Allow the Plan approval and General Operating permits to R.E for additional analysis and to. Activity options and is now called the Aggregate used in construction for Rock... 2018 Technical Deficiency letter to R.E September 4, 2020, DEP sent a Technical Deficiency letter a. Grapple, from the Rock Hill Quarry site Rock face near the North end is about 60 feet.... East Rockhill Township was established in 1740 and was the contract operator relationship with Hanson Aggregates PA, for. On several levels, and inspections May still be observable June 4, 2020 October 30,,! Health and conserve working farms, forests, and Public health and safety as Hunting! Hanson and is accessible year-round December 21, 2019, DEP received an email from R.E permission.